This was the first big day of working on the vehicle, we had tons of odd jobs, both large
and small, for everyone work on. While the overall appearance didn't change much we did
get a lot of things done. The electrical system to control all the code-3 lights and hazards
was planned out and most of the wiring was finalised and run in the looms.
Installing the bumper, side view.
Work continues...
Laser-Film removed and most the diamond plating installed on the top.