Quite a lot of work has been going on over the past 10 days: the diamond plating on the roof
is finished, the arrowstick is installed, and the doors are on, the electrical is nearly done,
and many others.
Inside the box, looking left to right: the electrical control box and
door assembly.
View from back with the side doors installed.
Arrow stick on the top is done, rollout tray in the back compartment not
yet installed.